BEGIN:VCALENDAR
VERSION:2.0
PRODID:-//Constructing Excellence | South West - ECPv6.15.20//NONSGML v1.0//EN
CALSCALE:GREGORIAN
METHOD:PUBLISH
X-WR-CALNAME:Constructing Excellence | South West
X-ORIGINAL-URL:https://constructingexcellencesw.org.uk
X-WR-CALDESC:Events for Constructing Excellence | South West
REFRESH-INTERVAL;VALUE=DURATION:PT1H
X-Robots-Tag:noindex
X-PUBLISHED-TTL:PT1H
BEGIN:VTIMEZONE
TZID:Europe/London
BEGIN:DAYLIGHT
TZOFFSETFROM:+0000
TZOFFSETTO:+0100
TZNAME:BST
DTSTART:20250330T010000
END:DAYLIGHT
BEGIN:STANDARD
TZOFFSETFROM:+0100
TZOFFSETTO:+0000
TZNAME:GMT
DTSTART:20251026T010000
END:STANDARD
BEGIN:DAYLIGHT
TZOFFSETFROM:+0000
TZOFFSETTO:+0100
TZNAME:BST
DTSTART:20260329T010000
END:DAYLIGHT
BEGIN:STANDARD
TZOFFSETFROM:+0100
TZOFFSETTO:+0000
TZNAME:GMT
DTSTART:20261025T010000
END:STANDARD
BEGIN:DAYLIGHT
TZOFFSETFROM:+0000
TZOFFSETTO:+0100
TZNAME:BST
DTSTART:20270328T010000
END:DAYLIGHT
BEGIN:STANDARD
TZOFFSETFROM:+0100
TZOFFSETTO:+0000
TZNAME:GMT
DTSTART:20271031T010000
END:STANDARD
END:VTIMEZONE
BEGIN:VEVENT
DTSTART;TZID=Europe/London:20260206T083000
DTEND;TZID=Europe/London:20260206T110000
DTSTAMP:20260530T200708
CREATED:20251029T075219Z
LAST-MODIFIED:20260202T101821Z
UID:10000154-1770366600-1770375600@constructingexcellencesw.org.uk
SUMMARY:CE Devon - Site Visit to Derriford Hospital Emergency Care Building - 6 February 2026
DESCRIPTION:MWD (Mace Willmott Dixon) under the Procure 23 (P23) programme have been instructed to build the new Derriford Hospital Emergency Care Building. This 16\,500m² facility is designed to replace the existing Emergency Department\, improving capacity and efficiency to meet the growing demand for urgent care services in the region. The project includes multiple specialised areas\, such as a ground floor for rapid assessment and diagnostic imaging\, a second floor dedicated to same day emergency care\, and a third floor featuring advanced theatres for neurosurgery\, stroke treatment\, and interventional radiology. Additionally\, a fourth floor will house five new theatres to support both emergency and planned surgeries. This project consists of 6 floors\, 4 floors of healthcare accommodation\, RC in-situ concrete frame\, link bridge to the existing hospital\, external cladding system\, a blue roof and associated externals and drainage. \nKey facts: \nEmergency Care Building\, University Hospitals Plymouth \n\nValue: £140m+\nSize: Four-storey facility and two storey plant space\nCompletion: December 2028 (Main building)\nUK’s first Wave 1 New Hospital Programme scheme to begin main construction – transforming emergency care for the South West\n\nTO ACCESS MEMBER TICKETS\, PLEASE LOGIN TO YOUR CESW ACCOUNT
URL:https://constructingexcellencesw.org.uk/event/ce-devon-site-visit-to-derriford-hospital-emergency-care-building-12-december-2025/
LOCATION:Derriford Emergency Care Hospital\, Derriford Road\, Crownhill\, Plymouth PL6 8DH\, United Kingdom
ATTACH;FMTTYPE=image/png:https://constructingexcellencesw.org.uk/wp-content/uploads/2025/10/black-white-simple-Talk-Logo.png
END:VEVENT
END:VCALENDAR