BEGIN:VCALENDAR
VERSION:2.0
PRODID:-//Constructing Excellence | South West - ECPv6.15.18//NONSGML v1.0//EN
CALSCALE:GREGORIAN
METHOD:PUBLISH
X-ORIGINAL-URL:https://constructingexcellencesw.org.uk
X-WR-CALDESC:Events for Constructing Excellence | South West
REFRESH-INTERVAL;VALUE=DURATION:PT1H
X-Robots-Tag:noindex
X-PUBLISHED-TTL:PT1H
BEGIN:VTIMEZONE
TZID:Europe/London
BEGIN:DAYLIGHT
TZOFFSETFROM:+0000
TZOFFSETTO:+0100
TZNAME:BST
DTSTART:20240331T010000
END:DAYLIGHT
BEGIN:STANDARD
TZOFFSETFROM:+0100
TZOFFSETTO:+0000
TZNAME:GMT
DTSTART:20241027T010000
END:STANDARD
BEGIN:DAYLIGHT
TZOFFSETFROM:+0000
TZOFFSETTO:+0100
TZNAME:BST
DTSTART:20250330T010000
END:DAYLIGHT
BEGIN:STANDARD
TZOFFSETFROM:+0100
TZOFFSETTO:+0000
TZNAME:GMT
DTSTART:20251026T010000
END:STANDARD
BEGIN:DAYLIGHT
TZOFFSETFROM:+0000
TZOFFSETTO:+0100
TZNAME:BST
DTSTART:20260329T010000
END:DAYLIGHT
BEGIN:STANDARD
TZOFFSETFROM:+0100
TZOFFSETTO:+0000
TZNAME:GMT
DTSTART:20261025T010000
END:STANDARD
END:VTIMEZONE
BEGIN:VEVENT
DTSTART;TZID=Europe/London:20250909T150000
DTEND;TZID=Europe/London:20250909T163000
DTSTAMP:20260430T033601
CREATED:20250710T145905Z
LAST-MODIFIED:20250710T152445Z
UID:10000130-1757430000-1757435400@constructingexcellencesw.org.uk
SUMMARY:CESW Cornwall Hub - Hallenbeagle Site Tour - 9th September 2025
DESCRIPTION:Please join us for a visit around Hallenbeagle which is a Waste Transfer Site currently being constructed for SUEZ . There will be a site tour followed by refreshments and a pasty donated by Kier Construction. \nA new waste and recycling hub is being developed on a 7-acre brownfield site in Cornwall to support the region’s updated household waste collection service. Replacing SUEZ’s existing operations in Pool\, the facility will process around 140\,000 tonnes of waste annually\, helping to increase recycling rates and support Cornwall Council’s net zero goals. The site includes a Materials Recycling Facility\, Refuse Transfer Station\, Baler building\, and a timber-framed office\, all built on remediated ground. The main 8\,400m² building features reinforced concrete structures and extensive infrastructure\, including on-site drainage treatment\, a new HV substation\, and a 1-megawatt rooftop solar array. The process plant\, integrated into the construction phase\, spans over 3\,000m² and includes complex systems like fire suppression and gas monitoring.
URL:https://constructingexcellencesw.org.uk/event/g4c-cornwall-hallenbeagle-site-tour-9th-september-2025/
LOCATION:Hallenbeagle – SUEZ Waste Transfer Facility\, Scorrier\, Redruth TR16 5UT\, Cornwall Business Park East\, Sawmills Lane\, Scorrier\, Redruth\, Cornwall\, TR16 5UT\, United Kingdom
ATTACH;FMTTYPE=image/png:https://constructingexcellencesw.org.uk/wp-content/uploads/2025/07/G4C-Cornwall-Hallenbeagle-site-tour.png
END:VEVENT
END:VCALENDAR